A contractor has sent you a price for your mother's suite, and you are not sure what to ask next. Look up the license on the state search first. Then check the contract for the notices the state demands, and ask about deposits and permits. Call us if the price arrived before anyone checked your lot.

Counties
Hillsborough, Pinellas, Pasco
Phone
(315) 640-3590
Offer
$100 off your first job

Check the license before the first site visit

The Florida Department of Business and Professional Regulation runs a public license search. Use it to verify any contractor before you sign, including a contractor we introduce. We cannot check each job for you, and we do not say that any contractor holds a license.

Florida's definition of a contractor reaches anyone who, for pay, takes on, bids on, or arranges construction, repair, alteration or addition work on a building for someone else. The contractor's registration or certification number must appear in each offer, proposal, bid, contract or advertisement. Open the search, type the name and the number, and read what it shows.

Three rules

The three rules, in one place

  1. Kitchen or no kitchen

    Will the suite have its own kitchen?

    A suite with its own kitchen is a second dwelling. Your city or county decides if it fits your lot.

    How this works

  2. Flood zone, half value

    Is your home in a flood zone?

    In a flood zone, half your home's value is the trigger. Past it, the whole house meets current flood rules. Most places use half (50 percent). Unincorporated Pinellas, St. Petersburg, Safety Harbor and unincorporated Pasco use 49 percent.

    How this works

  3. Parent aged 62 plus

    Will a parent or grandparent live there?

    New space is assessed on top of your capped value. A county reduction may apply. The parent must be 62 or older.

    How this works

Basis: Florida Statutes section 163.31771, Hillsborough County Land Development Code

Matching the license to your addition

A residential contractor's license covers one-, two- and three-family homes of up to two habitable stories over one uninhabitable story, plus accessory structures. A suite, a cottage and a garage conversion on a single-family home fit that description.

Ask the contractor which license they hold and whether it covers your job. Write the answer on the page where you keep your notes.

The two written notices in your contract

A residential contract above $2,500 has to include a written notice describing the Florida Homeowners' Construction Recovery Fund and what it covers. A direct contract above that amount for work on a home of up to four units must also carry a boldfaced lien law notice. It warns that unpaid suppliers may lien your property.

Read your contract for both notices before you sign. If one is missing, tell the contractor and ask for a corrected copy.

What a large deposit obliges the contractor to do

If a residential contractor asks for more than 10 percent of the price at the start, Florida expects permit applications within 30 days. Work should begin within 90 days after the permits are issued, unless there is good cause.

Ask what deposit the contractor wants and when they will apply. Write both into the contract. If the dates pass, call the contractor and ask why.

Concrete block wall rising beside a stucco house, with steel rebar standing out of the top course and a yellow level lying across it, under a blue sky with a palm

A recorded notice has to exist before the first inspection

Once a direct contract passes $5,000, the permit office asks for a copy of the recorded notice of commencement before it will do the first inspection. The notice goes on record with the clerk, so find out from the contractor who files it, and on what date.

St. Petersburg also asks for engineered plans with energy calculations and a scaled survey or site plan when you apply to permit a new ADU. Ask your own building office for its checklist before you start.

Serving as your own contractor, and how far that goes

Florida allows an owner to serve as the contractor on their own one- or two-family home. You must supervise the work on site, and the permit office must receive a signed disclosure statement. It is a real option for some owners, and it puts the risk on you.

Selling or leasing an owner-built structure within one year of completion raises a presumption that it was built for sale or lease, which falls outside the exemption. If you plan to rent a cottage soon after it is finished, ask the permit office before you choose this route.

Ask now, then decide once you have seen the plan.

Claim it Go to the request form

Why the lien notice matters to you

A contractor hires crews and buys materials from other businesses. If the contractor does not pay them, Florida law lets those suppliers place a lien on your property, even though you paid the contractor. The boldfaced notice in your contract warns you about that.

Ask the contractor how suppliers get paid, and ask to see receipts or releases as the job moves along. Keep them in your folder, and tell us if an answer worries you.

Warning signs on a price

  • The price arrives before anyone has seen the lot.
  • The contractor will not give a license number.
  • A large deposit is asked for with no date for the permit.
  • The scope says nothing about what the price leaves out.

Each of these is a cue to stop and ask. You can ask us to explain what a figure covers, and you can ask a second contractor to price the same plan before you decide.

Permits: who applies, and when

Ask your building office what it asks of a home addition in your town, and keep the list.

On most jobs the contractor applies for the permit, and the permit office tells you what it needs: plans, a survey, sometimes engineered drawings. If you act as your own contractor, the application is yours and so is the paperwork that follows.

Ask the contractor to name the person who applies and the date they will do it. Write both into your contract, and ask for a copy of the permit when it is issued. A job that starts before the permit is in hand can stall at the first inspection, so ask to wait.

Four printed floor plans spread on a wooden table with a tape measure and a pencil

Comparing two prices fairly

  1. Give each contractor the same plan and the same list of finishes.
  2. Ask each one what the price leaves out.
  3. Ask each one for the permit date and the deposit.
  4. Put the answers side by side before you choose.

The lowest number is not always the lowest price. A price that leaves out the survey or the utility trench may end up above one that includes them. Ask, and write the difference down.

Questions for the first meeting

  • What is your license number, and which license is it?
  • When will you apply for the permit, and who files it?
  • What does your price leave out?
  • What deposit do you need, and when is the next payment due?
  • Who is on site each day, and how do I reach them?

Take the list with you and write the answers on it. Ask the same questions of every contractor, so you can lay the answers side by side.

Ask now, then decide once you have seen the plan.

Claim it Go to the request form

What to keep in one folder

  1. The signed contract with both notices.
  2. The license search result for each business on the job.
  3. The permit, the notice of commencement and every inspection record.
  4. Receipts for each payment, with the date next to each one in the contract.
  5. Any written change to the plan or the price.

A folder like that helps you if a question comes up with the building office, the property appraiser or a buyer later. Ask the contractor to hand over the final papers on the last day.

What we do, and what we leave to the contractor

We help you plan the space and find out which rules apply at your address, and then connect you with a contractor who works near your home. We do not do the building, and we set no prices. The contractor does the building and handles the permits, and your contract is with them.

Use the three questions on our home page when you meet them, and use the state license search before you sign. Call us if a price or a contract raises a question.

Garage interior framed out into rooms, with insulated stud walls, a new window, an open doorway to the yard and a plywood floor platform beside a sawhorse table

We find out what your lot allows, then put you in touch with a contractor near you, who does the building.

Tell us about the space

Send the address and what you have in mind. The rules for that lot come first.

Prefer to talk? Call (315) 640-3590

  1. Your request is in Keep your phone close. A call comes from (315) 640-3590.
  2. The lot comes first We look at what your city or county allows at that address.
  3. Then a contractor You meet a local contractor and see the price in writing.

$100 off your first job We credit $100 on the first job you book with our help.

  • We pay the $100, so the contractor's price stays as quoted.
  • One credit per customer for each home.
  • Your job must be booked by December 31, 2026.
  • Say you want the credit when you book.

Claim it Offer terms

The Senior Home Additions promise

  1. Your first call and your request are free.
  2. Planning with us costs you nothing.
  3. We check the rules at your address before anyone quotes.

Read the full terms

The Senior Home Additions promise

  1. Your first call and your request are free.
  2. Planning with us costs you nothing.
  3. We check the rules at your address before anyone quotes.
  4. We credit the $100 the way our Terms describe.

Your agreement with the contractor you hire covers the building.

Senior Home Additions, (315) 640-3590 Read the full terms

$100 off your first job We credit $100 on the first job you book with our help.

  • We pay the $100, so the contractor's price stays as quoted.
  • One credit per customer for each home.
  • Your job must be booked by December 31, 2026.
  • Say you want the credit when you book.

Claim it Offer terms

Ask us what to bring to your first contractor meeting.