Skip to content
Senior HomeAdditions (315) 640-3590 Tap to call
Open step-free bathroom with gray tile, a folding shower seat, grab bars on two walls, a floor drain strip and a window onto palm fronds

Sheet A-2 ยท Ground-floor suites

Bring your bedroom and bath down to the main floor

Planning a ground-floor suite? You get $100 off your first job once you have booked.

You climb the stairs at the end of every day, and you would like to stop. A ground-floor suite puts a bedroom and a bath beside the rooms you already use. Tell us your address and we will check the flood line and the lot limits first, then introduce a local contractor.

Counties
Hillsborough, Pinellas, Pasco
Phone
(315) 640-3590
Offer
$100 off your first job

Three rules

Three rules decide what your lot allows

  1. Flood zone, half value

    Is your home in a flood zone?

    In a flood zone, half your home's value is the trigger. Past it, the whole house meets current flood rules. Most places use half (50 percent). Unincorporated Pinellas, St. Petersburg, Safety Harbor and unincorporated Pasco use 49 percent.

    How this works

  2. Parent aged 62 plus

    Will a parent or grandparent live there?

    New space is assessed on top of your capped value. A county reduction may apply. The parent must be 62 or older.

    How this works

  3. Kitchen or no kitchen

    Will the suite have its own kitchen?

    A suite with its own kitchen is a second dwelling. Your city or county decides if it fits your lot.

    How this works

Basis: 44 CFR 59.1, Pinellas County substantial damage and substantial improvement

We find out what your lot allows, then put you in touch with a contractor near you, who does the building.

Tell us about the space

Send the address and what you have in mind. The rules for that lot come first.

Prefer to talk? Call (315) 640-3590

  1. Your request is in Keep your phone close. A call comes from (315) 640-3590.
  2. The lot comes first We look at what your city or county allows at that address.
  3. Then a contractor You meet a local contractor and see the price in writing.

$100 off your first job We credit $100 on the first job you book with our help.

  • We pay the $100, so the contractor's price stays as quoted.
  • One credit per customer for each home.
  • Your job must be booked by December 31, 2026.
  • Say you want the credit when you book.

Claim it Offer terms

The Senior Home Additions promise

  1. Your first call and your request are free.
  2. Planning with us costs you nothing.
  3. We check the rules at your address before anyone quotes.

Read the full terms

This fits when

When ground-floor suites fits

  • The bedroom is upstairs
    Every night ends with a flight of stairs, and every morning starts with one.
  • Recovery from surgery is coming
    A planned hip or knee operation makes a main-floor bedroom useful for months.
  • The only full bath is down the hall
    Your current bath has a tub you step over, and the room has no space to change that.
  • You want to stay in this neighborhood
    The house suits you, and the street is where your friends and your doctor are.
  • A spouse needs more room
    One of you needs a wide door and a roll-in shower, and the other keeps the old bedroom.

The lot, drawn

Where it goes on the lot

New suite123
  1. 1 Where it sits Against the rooms you already use, at the same level.
  2. 2 What it joins The slab, the roof and the air system of your house.
  3. 3 What the lot allows Setbacks, lot coverage and the flood line.

Basis: 44 CFR 59.1, FEMA P-758 Substantial Improvement/Substantial Damage Desk

General notes

Answers for this space, before you call.

Do I need a separate kitchen for a ground-floor suite?

No. A bedroom and a bath that join your own rooms are a different job from a second home. If you add a kitchen, your city or county may treat the suite as a second dwelling.

Can I convert an existing room instead?

Sometimes. A den or dining room on the ground floor may take a bath. Ask the contractor to price both ways, then compare each against the half-value line.

What if my house is not in a flood zone?

Then the flood test is not the main question. Your lot limits, your roof and your budget decide the job. Send the address to confirm the zone.

Will a raised floor make the entry harder?

It can. A raised floor means a ramp or steps at the door, so plan the entry with the room. Tell the contractor how you move.

Who decides the value of my house?

It depends on the place. Pinellas posts a FEMA letter, Hillsborough uses its appraiser's figure or an appraisal, and Tampa compares the work with the appraiser's value.

Can my spouse and I keep both bedrooms?

Yes. Many couples keep the old bedroom and add one on the ground floor. Say so in your brief, and the contractor will price both.

Send your address and see what the lot allows.

Claim it Go to the request form

Scope

What the planning and the work include

  • The flood check
    Before a size is chosen, we look up your flood zone and who values your house for the half-value test.
  • The room brief
    You tell us where you sleep, bathe and dress now. That becomes the plan the contractor prices.
  • The introduction
    We introduce a local contractor who works in your county.
  • The building work
    The contractor sets the slab, frames the room, ties the roof and finishes the bath. That is your contract with them.
  • The handover
    You walk the room with the contractor and keep the permit papers in one folder.

On paper

What to hold in writing before you sign

  1. The value used for the flood test
    Ask for the structure value your building office will use, and keep a copy.
  2. A cost estimate that covers all the work
    The building office compares it with that value.
  3. The license number
    The license number, searched on the state site before you sign anything.
  4. The permit and the final inspection
    These are the papers a buyer or an insurer may ask for later.

Where your lot stands on the half-value test

A bedroom and bath on the ground floor is an addition, and an addition on a flood-zone lot is measured against the value of the house. When the cost reaches half that value, the whole house must meet current flood rules, not only the new room.

Most places use half (50 percent). Unincorporated Pinellas, St. Petersburg, Safety Harbor and unincorporated Pasco use 49 percent. For each Pinellas parcel, the Pinellas County Property Appraiser posts a FEMA letter that shows the structure value used in the test. Ask for yours before you choose a size.

In New Port Richey the building office uses the appraiser's structure value and a contractor's cost estimate that covers all the work. Call us if your town is not named here, and we will find your office.

Who counts your own labor and your own materials

Some families plan to do part of the work or accept donated materials. Unincorporated Hillsborough County counts owner or volunteer labor and donated materials at market value on the cost side of the test, so doing it yourself does not shrink the number.

Tampa prices the work with a published square-foot table and compares it with the appraiser's value of your house. Ask your building office for its form before you collect a price.

Concrete block wall rising beside a stucco house, with steel rebar standing out of the top course and a yellow level lying across it, under a blue sky with a palm

A suite for your own later years and your assessment

Florida assesses an addition at its full value in the January after it is finished. That applies to a suite you build for yourself. The county reduction in Fla. Stat. 193.703 is meant for a parent or grandparent who is 62 or older and lives in new quarters.

If the suite is for you, ask your property appraiser how the addition will be assessed, and plan the budget around the answer. If a parent will use the room instead, read our guide on the reduction first, then send your address.

Which rooms can sit below the flood line

Some towns limit what may sit below the base flood elevation. In New Port Richey, only parking, a way into the building and a little storage may sit that low. Bathrooms, laundry rooms and mechanical equipment must go above it. A ground-floor suite may therefore need a raised floor.

Ask your contractor to show the floor height on the plan, step by step from the door.

Plan the room around a normal day

Start from a day, not a drawing. Walk through your morning: waking, bathing, dressing, a first coffee. Note what you want within a few steps of the bed. Most families land on a bedroom, a bath with a shower you can walk into, a closet and a small laundry nook.

Say how you move today and how you might move in five years. A contractor can draw doors and halls wider if you use a cane or a walker now, and a change on paper is easier than one in a finished wall. Write your list and send it to us with the address.

Living in the house while the work goes on

An addition joins your house at one wall, and that wall is open for a stretch of days. Ask the contractor where the work will cut into the house, which rooms will be dusty and when the power or water will be off.

Plan somewhere to sleep and cook for those days if your own bedroom is affected. Ask for the schedule in writing, and choose a start date that suits your health and your calendar rather than the contractor's.

Drawing set

From first call to a signed contract

  1. A-1

    Send your address

    Tell us about the house and where you sleep today.

  2. A-2

    Learn the flood line

    We find the flood zone and the number that applies on your street.

  3. A-3

    Meet a contractor

    One local contractor visits, measures and writes a price for your plan.

  4. A-4

    Compare and decide

    Read the price, ask your questions and sign only when it feels right.

Price

What moves the price of ground-floor suites

  • The height of the new floor, if your lot is in a flood zone.
  • How much of the bath is built for a wheelchair or a walker.
  • A new slab or a floor framed over a crawl space.
  • Moving or extending the air handler and the ducts.
  • Tying a new roof into an older one without a leak.
  • Doors, thresholds and a shower with no curb.
  • Plan and permit fees that sit outside the contractor's price.
New window set in the framing of a wall addition beside the stucco house, with roof trusses and metal connector plates above and palm reflections in the glass

The Senior Home Additions promise

  1. Your first call and your request are free.
  2. Planning with us costs you nothing.
  3. We check the rules at your address before anyone quotes.
  4. We credit the $100 the way our Terms describe.

Your agreement with the contractor you hire covers the building.

Senior Home Additions, (315) 640-3590 Read the full terms

$100 off your first job We credit $100 on the first job you book with our help.

  • We pay the $100, so the contractor's price stays as quoted.
  • One credit per customer for each home.
  • Your job must be booked by December 31, 2026.
  • Say you want the credit when you book.

Claim it Offer terms